Musenyi-Gasibe Water System #70

PROJECT KICKOFF

We are pleased to announce that construction on the Museyi-Gasibe water system began on February 13, 2024. The community has a nonfunctioning water system that was constructed by a different organization decades ago. Currently, there is no clean water located near the region’s three primary schools. By abject necessity, the majority of the population relies on a primary water source that is several miles away from the community, and the water there is contaminated. 

Preventable, water-borne diseases are the leading cause of death in Burundi, which has the 12th highest child mortality rate globally. Communities with Gazelle Foundation water systems have drastically reduced, and in some cases eliminated, the presence of water-borne illnesses among the families that live in them.

Thanks to our generous supporters this project will serve 3,500 people, including 379 students and teachers at Gasibe Primary School, 226 students and teachers at Kivyirame Primary School, and 455 students and teachers at Bitezi Primary School.


WATER ACCESS PRIOR TO CLEAN WATER SYSTEM PARTNERSHIPS

Building sustainable water systems breaks the cycle of poor health and poverty. The fact is, that preventable, waterborne diseases are still a leading cause of death in Burundi. Communities with Gazelle Foundation water systems have drastically reduced, and in some cases eliminated, the presence of water-borne illnesses among the families that live in them.

Clean water means clear futures for the residents whose young people can pursue education while their families can devote more time to farming and other economic activities to strengthen their community’s long-term resilience. Access to clean and safe water for their daily use ensures environmental, economic, and social health, an important legacy of sustainability which is built into each project. 


Project Overview

  • Construction dates: February 13, 2024 - July 25, 2024

  • Located in Murenge and Gasibe Collines

  • Scope: 14,500km pipeline

  • 2 new storage tanks

  • Refurbishing 15 water tanks

  • 2 new tap stands

  • Refurbishing 20 tap stands

  • Employees: 75 workers including masons and plumbers

  • Serves 3,500 residents


Project Schematic

The project will serve approximately 3,500 people from the general population including 3 schools.


Gazelle Foundation is Uniquely Qualified for this project

We continue to maintain a 100% success rate. Refurbishing and expanding the system will provide clean water to this community for years to come.

Key technical solutions for this system include; constructing two new water tanks that will provide consistent water pressure to meet fluctuating needs and installing new distribution pipelines. Hiring local workers for the project construction also develops local knowledge for upkeep and maintenance, as the ownership of all water systems are turned over to the community upon completion. Meet our project manager.


HOW IT WORKS

Water is captured from a source before it can become contaminated.  It is filtered in the collection chamber and flows onward. Entrenched PVC pipe carries water to tanks and to multiple tap stands. Tap stands are strategically positioned within easy walking distance to schools, churches, community centers, and other central locations to maximize access points for residents. Water is available for free to all people regardless of the person’s tribe or religion.

Follow our progress on Facebook and Instagram for the most up-to-date details.


CLEAN WATER MEANS EDUCATION

Without access to clean water, people must spend valuable time collecting water for daily use, and they are sick more often, due to preventable water-borne diseases. Both of these have a disproportionate impact on children, whose school attendance suffers because they are needed at home or are simply ill. With clean, accessible water, these barriers to education disappear

The availability of clean water and the resulting improvements in health and education begin to reverse the cycle of poverty. According to the World Bank, returns on education investment are the largest in Africa over any other continent, and each additional year of schooling raises earnings by 11% for boys and 14% for girls.


Project Updates

Interim Project Update 1:

Progress on the Musenyi-Gasibe Water Project is underway. Jean Bosco Ndabaniwe, our project manager, reports progress is moving along well. Milestones completed as of March 18, 2024 include:

  • Sources catchment protection are 60% complete

  • Rehabilitation of 2 collection chambers is complete

  • Rehabilitation of 1 tank is complete

  • 1 (of 22) tap stands is complete

  • Digging trenches is around 2 km

  • Connection of pipes is around 1.2km

Wonderful news indeed.
We are happy to hear the two communes are working together and that they are pleased with the work the Gazelle Foundation is doing through your leadership. Thank you, Bosco and the team for what you do for communities in Burundi.
— Gilbert Tuhabonye, March 18, 2024

Interim Project Update 2:

Progress on the Musenyi-Gasibe Water Project is on time and on budget. Jean Bosco Ndabaniwe, our project manager, reports the following milestones as of April 14, 2024:

  • Sources catchment protection are 90% complete

  • Rehabilitation and testing of 5 tanks is complete

  • 9 (of 22) tap stands are complete

  • Digging trenches is around 4 km

  • Connection of pipes is around 8km


JOIN OUR MISSION

This project was funded by a wonderful supporter like you. We thank the generous donors for changing the lives of the people in this community through access to clean water. 

Our next water system depends on you! We have 36 months of shovel-ready projects lined up - all we need is your support. Help us give the gift of clean water to those that need it most.